BUND GARDEN RIVER BRIDGE, PUNE INDIA
Fastening light poles and handrails with Hilti HVA and HST anchors
THE CHALLENGE
The local authority in Pune commissioned a new bridge over the river to smooth out traffic flow in the city.
But during the late stages of the project the position of light poles and the design of the railings were changed.
The project manager had to find a solution, which could face tight deadlines but also could cope with a low embedment depth for the anchors.